Categories

High Voltage Line,

Client

OSHEE

Description

Turn-Key Project

Construction Design, Civil works, supply and installation of steel lattice tower, installation of the new conductor ACSR 120 / 20mm2 (including insulation), GSW 35mm2, XLPE Cable 35 (42) kV.

Total Length of OHL: 21 km

Total Length of Cable Line: 1.9 km

Year: 2021

×
img

    Get In Touch

    Contact Info

    Phone number

    (+355) 69 60 01 422

    Email address

    [email protected]

    Address info

    Rr. Teodor Keko Pallati Pelivani Shkalla 2, Kati 3, Tirane, Albania