Skip to content
Construction of the TU network with ABC cable in Elbasan-Cërrik

The complete construction of the TU network with ABC cable in the Cerrik-Gostime area was done, the dismantling of the existing TU network, the replacement with ABC cable, new poles and the replacement of the cable of the end subscribers was also done, the reconstruction of the cabins was also done.

Total Line Length: 49 km

Year: 2019

Construction of the TU network with ABC cable in Elbasan-Cërrik
Year
2019
Category
Low Voltage Line
POWER, CONFIDENCE, SECURITY!

Be the first to know about the latest news

Copyright © 2025 ENCOAL, All rights reserved. Created by NMC Soft.