Construction of the 10 kv line, which crosses the lake

In this project, the construction of two steel poles for crossing the lake to be connected to the existing 10 kV line Rrëshen was carried out.

Line length: 1 km

Year: 2017

Construction of the 10 kv line, which crosses the lake
Year
2017
Category
Medium Voltage Line