Reconstruction of the 110 kV Laç 2-Skuraj Line

The reconstruction of the 110 kV double circuit line Nst Laç 2-Skuraj, Demonstration of the existing old line, construction of the new line and installation of ACSR 240/40mm2, and OPGW was done.

Line length: 21 km

Year: 2021

Reconstruction of the 110 kV Laç 2-Skuraj Line
Year
2021
Category
High Voltage Line