Reconstruction of the 35 kV Line, 30 / 7-30 / 9, Fier – Patos – Ballsh

The new construction of the TL 35 kV Nst Tec 2 line Fier-Nst 35 kV Patos-Nst 110/35 kV Ballsh, including: Implementation project, construction works, completion and installation of metal pillars, installation of the new conductor ACSR 120/ 20mm2 (including insulation), 35mm2 steel wire, XLPE cable 35(42)kV.

Total Airline Length: 21 km

Total length of the cable line: 1.9 km

Year: 2021