Reconstruction of the Plasma Substation 110/35/20 kv, Lushnje

This project includes the dismantling of existing equipment, construction of new foundations, retaining walls, cable channels, replacement of old primary and secondary equipment with new equipment, reconstruction of the battery room, implementation of the SCADA system and their integration into the system of OST.

Year: 2019

Reconstruction of the Plasma Substation 110/35/20 kv, Lushnje
Year
2019
Category
Electrical Substation