35 kV line, connection of HEC Diga with the Transmission Network

This project includes Design of OHL, Construction of 35 kV OHL for connection of HEC DAM to transmission system and 35kV switches, testing and commissioning of 35/0.4 kV aux transformer.

Line length: 1.3 km

Year: 2017

35 kV line, connection of HEC Diga with the Transmission Network
Year
2017
Category
High Voltage Line