Construction of the 2×110 kV Power Line Babicë – Sarandë (Lot 2)
Construction of the 2×110 kV Power Line Babicë – Sarandë (Lot 2)

Construction of the 2×110 kV transmission line Babicë–Sarandë (Lot 2) as a subcontractor for the Transmission System Operator (OST sh.a). The works included civil works and foundations, tower erection, conductor stringing and OPGW installation.

Client
OST
Year
2015