Construction of the 2×110 kV Power Line Elbasan 1 – Cërrik

The project was implemented as a turn-key project, including design, topographical services and geological studies. Works included dismantling existing structures, civil works and foundations, tower erection, conductor stringing, OPGW installation, and testing and commissioning.

Construction of the 2×110 kV Power Line Elbasan 1 – Cërrik
Client
Operatori i Sistemit të Transmetimit – OST sh.a
Year
2023