Construction of the 2×110 kV Power Line Elbasan 1 – Fierzë
The project was implemented as a turn-key project, including design, topographical services and geological studies. Works included dismantling existing structures, civil works and foundations, tower erection, conductor stringing, OPGW installation and testing and commissioning.