Skip to content
Construction of the 30/60 MW BESS – Phase II, Nova Solar System

Construction of Phase II of the Battery Energy Storage System (BESS), with a power capacity of 30 MW and an energy capacity of 60 MWh. The project includes battery systems, PCS units, electrical and auxiliary infrastructure, SCADA/EMS, protection and control systems, testing, and commissioning.

Construction of the 30/60 MW BESS – Phase II, Nova Solar System
POWER, CONFIDENCE, SECURITY!

Be the first to know about the latest news

Copyright © 2026 ENCOAL, All rights reserved. Managed by NMC Soft.