Skip to content
Construction of the 54/108 MW BESS – Phase III, Nova Solar System

Construction of Phase III of the Battery Energy Storage System (BESS), with a power capacity of 54 MW and an energy capacity of 108 MWh. The project includes battery systems, PCS units, electrical and auxiliary infrastructure, SCADA/EMS, protection and control systems, testing, commissioning, and integration with the electrical grid.

Construction of the 54/108 MW BESS – Phase III, Nova Solar System
POWER, CONFIDENCE, SECURITY!

Be the first to know about the latest news

Copyright © 2026 ENCOAL, All rights reserved. Managed by NMC Soft.