Construction of the TU network with ABC cable Fushe Kruje

The complete construction of the TU network with ABC cable was done, the dismantling of the existing TU network, the replacement with ABC cable, new poles and the replacement of the cable of the end subscribers was also done, the reconstruction of the cabins was also done.

Total Line Length: 45 km

Year: 2018

Construction of the TU network with ABC cable Fushe Kruje
Category
Low Voltage Line