Construction of the TU network with ABC cable in Elbasan-Cërrik
The complete construction of the TU network with ABC cable in the Cerrik-Gostime area was done, the dismantling of the existing TU network, the replacement with ABC cable, new poles and the replacement of the cable of the end subscribers was also done, the reconstruction of the cabins was also done.
Total Line Length: 49 km
Year: 2019