Construction of the TU network with ABC cable of 23 cabins Cerrik-Gostime
The complete construction of the TU network with ABC cable was done in the Cerrik-Gostime area, the dismantling of the existing TU network was done, the replacement with ABC cable, new poles and the replacement of the cable of the end subscribers, the reconstruction of the cabins was also done.
Total Line Length: 53 km
Year: 2021