Skip to content
Construction of the TU network with ABC cable of 23 cabins Cerrik-Gostime

The complete construction of the TU network with ABC cable was done in the Cerrik-Gostime area, the dismantling of the existing TU network was done, the replacement with ABC cable, new poles and the replacement of the cable of the end subscribers, the reconstruction of the cabins was also done.

Total Line Length: 53 km

Year: 2021

Construction of the TU network with ABC cable of 23 cabins Cerrik-Gostime
Year
2021
Category
Low Voltage Line
POWER, CONFIDENCE, SECURITY!

Be the first to know about the latest news

Copyright © 2025 ENCOAL, All rights reserved. Created by NMC Soft.