Reconstruction of the 145 kV line and Installation of OPGW Bistrica 1-Kufi

The reconstruction of the 154 kV line Bistrica 1- Kufi was done as well as the replacement of GSW with OPGW optical fiber.

Line length: 34 km

Year: 2020

Reconstruction of the 145 kV line and Installation of OPGW Bistrica 1-Kufi
Year
2020
Category
High Voltage Line