Projects
Construction of the 62 MW Photovoltaic Park, 110 kV Line and 35/110 kV Substation – Fortis Energy
Construction of the 1×35 kV Arrëz HPP – Kacinar Substation Line
Construction of the 54/108 MW BESS – Phase III, Nova Solar System
Construction of the 30/60 MW BESS – Phase II, Nova Solar System
Construction of the 50 MW Nova Solar System II Photovoltaic Park
Construction of the 2×110 kV Kafaraj – Vlorë 1 – Babicë Line
Construction of the 1×110 kV Tirana 1 – Traktora Underground Cable Line
Construction of the 35/110 kV Kafaraj – Hoxharë Line
Construction of the 400 kV Elbasan 3 Substation
Reconstruction of the 1×110 kV Ballsh – Memaliaj Line, Segment I
Relocation of the 2×110 kV Shkozë – Farkë – Selitë Underground Cable Line
Construction of the 50 MW Nova Solar System Photovoltaic Park – Hoxharë
Construction of the 35 kV TEC Delvinë – Delvinë Substation Line
Construction of the 2 MW Albsolar Photovoltaic Park – Durrës
Construction of the 110 kV Substation Lenie – Maliq
Construction of the 1×110 kV Power Line Lenie – Maliq
Construction of the 110/20 kV Substation Fier 2
Construction of the 2×110 kV Power Line Elbasan 1 – Cërrik
Reconstruction of the 220 kV Substation Sharrë, Tirana
Construction of the 35/110 kV Substation PFV NSS Hoxharë
Construction of the 2×35(110) kV Power Line PFV NSS Hoxharë
Construction of the 2×110 kV Power Line Elbasan 1 – Fiber
Construction of the 2×35(110) kV Power Line Korçë – Bilisht
Construction of the 1×35(110) kV Power Line Fier – Patos – Ballsh
Replacement of the Conductor on the 35 kV Mjekës – Elbasan Line
Replacement of the Conductor on the 35 kV Reshen – Kaçinar Line
Construction of the 10 kV Distribution Line Cekaj
Construction of the 35 kV Power Line for HPP Ayen
Erection of Towers for the 400 kV Power Line Koman – Tirana
Construction of the 2×110 kV Power Line for HPP Sllabinjë
Construction of the 2×110 kV Power Line Lapaj – Peshkopi
Construction of the 2×110 kV Power Line Babicë – Sarandë (Lot 2)
35 kV line, connection of HEC Diga with the Transmission Network
Reconstruction of the 35 kv line Korçe-Maliq
Construction of the TU network with ABC cable in Elbasan-Cërrik
Construction of the TU network with ABC cable Fushe Kruje
Construction of the TU network with ABC cable of 20 Burrel-Klos cabins
Construction of the TU network with ABC cable of 23 cabins Cerrik-Gostime
Construction of the 10 kv line, which crosses the lake
Reconstruction of the 145 kV line and Installation of OPGW Bistrica 1-Kufi
Reconstruction of the 110 kV Laç 2-Skuraj Line
Reconstruction of the 35 kV Line, 30 / 7-30 / 9, Fier – Patos – Ballsh
Reconstruction of Rashbull Substation
Reconstruction of the Plasma Substation 110/35/20 kv, Lushnje
Hardware installation and implementation of PLC logic in LFC management
Testing and approval of the power transformer and 35 kV line, Hec Ura e Fani