Medium Voltage Line,
AYEN AS ENERGJI
In this project was realized the construction of two OHL steel lattice towers for crossing the lake of the existing 10 kV line Rreshen.
Total Line Length: 1 km
Year: 2017
(+355) 69 60 01 422
[email protected]
Rr. Teodor Keko Pallati Pelivani Shkalla 2, Kati 3, Tirane, Albania